Turn “deep clean” into a task schedule
| Task group | What the schedule should specify |
|---|---|
| Detailed room cleaning | Accessible furniture, edges, ledges and surfaces; arrangements for clearing rooms. |
| Carpet care | Areas, stain treatment where suitable, extraction method, drying and return-to-use requirements. |
| Hard-floor maintenance | Floor type and condition, compatible treatment and any restoration included. |
| Washrooms | Detailed fixtures and accessible surfaces, with suitable products and safe methods. |
| High or difficult access | Height, approved access method and any specialist work quoted separately. |
Plan around maintenance and access
Cleaning before dusty building work finishes can create avoidable rework. Agree which rooms are handed over first, when contractors leave and when furniture returns.
Include drying and curing periods where the chosen method requires them. The completion date should leave time for a joint inspection and correction before pupils return.
Ask what the periodic allowance actually buys
An annual number of “holiday weeks” does not describe the work by itself. Ask for the planned labour hours, methods, equipment, room coverage and exclusions. Confirm whether consumables and specialist subcontract work sit inside the price.
Avoid double-counting. If the annual contract already includes holiday-cleaning labour, do not add the same hours again as a separate periodic allowance in the calculator.
A practical holiday-cleaning handover
- The task schedule shows the rooms and work completed.
- The school can access the finished areas safely.
- Outstanding tasks and restricted areas are recorded.
- The inspection allows time for agreed corrections.
- Equipment and chemicals are stored safely before reopening.
Holiday-cleaning questions
Does deep cleaning include windows or high-level work?
Only where the quotation includes them and a suitable access method has been agreed. Check internal glazing, external windows and high-level work separately.
Can periodic work be completed in shorter holidays?
Some tasks can, depending on access, staffing, equipment and drying time. Plan the work from the task list and reopening date.